top of page

case studies

click the image to read the full lighting story

1.png

Marley sports centre

As a preferred contractor for Bradford City Council, RMP were brought in to upgrade the football pitch lighting at Marley Sports Centre in Keighley, now a full-size floodlit "4th Generation Field Turf" pitch.

weddel swift
distribution

The upgrade has brought not only a consistent light level across the site but has ensured the customer is now enjoying significant energy savings at a time when electricity tariffs are soaring.

3.png
2.png

leyland trailer
& truck ltd

Andy Morris (Managing Director) at LT&T commissioned RMP to replace the outdated lighting in his warehouse, offices, breakout and circulation areas.

It was vital that the warehouse was lit to the right levels with minimal glare to prevent hazards to operatives.

harmony blinds
of bolton

Harmony Blinds required their factory to have daylight working conditions as attention to details is imperative to offer their customers exception quality of fabrics for their line of work.

4.png
JJ Food Manchester Freezer (New).jpg

jj foodservice

JJ Foodservice are a national wholesaler with a proud 35-year history. With 11 depots across the country, RMP came on board to upgrade the lighting in the Manchester site, a 24-hour operation supplying premium ingredients to over 83,000 customers. 

jd motors

RMP recently worked with JD Motors to supply their new LED light fittings and deliver a substantial saving in their energy costs. 

IMG-20230618-WA0018.jpg
bottom of page